How To Properly Install T111 Siding
Place your t 111 siding on the saw horses for easy handling and cutting.
How to properly install t111 siding. Siding manufacturers make t1 11 siding a five ply exterior grade plywood siding in 4 foot by 8 foot sections with a grooved surface and shiplap edges. However t1 11 should never actually be installed flush with the ground as this contact can increase moisture buildup and promote mold growth. John latorre a contractor in tolumne california replies. T1 11 s grooves and shiplap edges run parallel to its 8 foot long edge.
The t1 11 siding s 1 inch wide 1 4 inch deep grooves are spaced 11 inches apart. Hook your tape measure to an outside corner edge of your framing. Begin siding by starting at the bottom of the building you want to side. Remove all excess wood nails and debris from your studs where you will be installing t 111 siding.
Prime all four edges of each sheet before you hang it as a safeguard against moisture damage. It has been in use for more than four decades wherein the core concept and the appearance of the t1 11 siding is still similar to its decades old format. Paint or stain t1 11 after installing it to lengthen its lifetime and enhance its appearance. T 111 is best installed over tar paper or housewrap stapled to studs.
T1 11 siding grades varieties. Following the two tips below will help in this regard. If you paint it giving it. The best option for windows is the type with a vinyl flange all the way around.
T1 11 sidings are sold in two main variations. Start at the bottom and work your way up. T1 11 siding first rose to prominence during the late 1960s. T1 11 siding can be installed using 1 5 8 inch exterior screws or 12d galvanized nails and it s best to start from the bottom up to achieve a clean seamless application.