How To Install Aluminum Siding Starter Strip
This will help control water flow and prevent leakage.
How to install aluminum siding starter strip. Position the end of a starter strip at this point. This video shows how to install a starter strip for vinyl and polymer siding installation. How to properly install siding starter strips. Install each course following your pencil marks while checking for level along the way.
Then nail them to the surface you re working on leaving 16 inches 41 cm between each strip. Now you can install a 3 8 x 1 inch starter strip of siding to give the first course the proper angle. Make a measurement using the tape measure allowing for the width of the corner post plus an additional 1 4 inch from the corner. To install the furring strips start by cutting them to size so they run from one end of the surface to the other.
Attach the siding to the wall with a nail in each section of the nail strip. When installing the starter strips allow a 1 8 inch space for corner posts and j channels for expansion. If using insulation or backerboard shim if necessary to accommodate the added thickness. Your first piece will lock into the starter strip at its bottom edge the top of the first piece has a nailing band that should be held down with aluminum roofing siding nails.
Staret strip secures the first course of siding to the home. Make sure you install the furring strips horizontally and not vertically. Nail in the center of the nailing slots. Install your starter strip drip edge at the bottom of the wall and allow it to extend past the area where the foundation meets the sill plate by at least an inch.
Keep ends of adjoining starter strips at least 1 4 inch apart to allow for expansion. Proper installation of of the everlast starter strip is critical. They need to run in the opposite direction of the metal siding. Each sheet of siding has a nail strip at the top.
Be sure to place nails inch from the top edge of the lap siding to help keep your siding tight to the wall. Build with us. When installing the trim at the windows start at the bottom then move to the sides and install the top portion last.