How To Replace Drip Edge On Existing Roof
Slide the flat bar under starter course and pry out the nails.
How to replace drip edge on existing roof. Use a flat pry bar to remove drip edge nails along the eave and rakes. Make sure the outer edge extends over the gutter. Install the eave strips on the lower roof edges first with the eave strips under the shingles and felt underlayment. Drive 1 2 nails in per rafter so it doesn t move around.
With without rain gutters. You may need to use a putty knife to break the seam between the first course and the starter strip. Secure the drip edge with roofing cement. Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
Use 1 2 nails through each rafter to secure your fascia board. Jkf may 14 16 at 18 02. This lets any water that gets on the roof run down the underlayment and over the drip edge. Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Now that the roof is applied it is much more difficult invasive time consuming to install the drip edge being 3 stories only makes it much worse. Installing drip edge on your roof. 1 1 2 minimum is totally standard procedure in canada anyhow. Replacing drip edge eave strips.
When removing the roof they could have removed the existing siders edge and replaced it with the drip edge this would not have been very difficult standard even. The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge. If it doesn t pull the drip edge out slightly from under the shingles. Hold the board in place and use 2 in 5 1 cm nails and a hammer to secure it in place.
Tools supplies tin sn. At 7 05 paul begins replacing the drip edge roof flashing. Lift up roof shingles and nail the eave strip in place with galvanized. This is important to protect damage to your fascia soffits rafters.