How To Shingle A 3 Tab Roof
Make sure that the tabs are lining up with the bottom line and that the tabs are facing down.
How to shingle a 3 tab roof. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps. If you are using a power nailer drive nails by squeezing the trigger and bouncing the nailer s tip onto the shingle. Cut the necessary number of pieces for the ridge cap from the 3 tab shingles. Install the drip edge over the gable end felt and under the eaves felt.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles. Many pros shingle in a vertical line up the roof because it s much faster. The first full shingle that you lay will need to be laid along the centerline of your roof. You will once again need 4 nails whenever you are installing the 3 tab shingles.
To attach a 3 tab shingle align it with the layout line and drive nails 1 2 inch above the cutout slots including the half slots at each side. Step 2 determine the prevailing wind pattern for the area. They will go in the same location as the nails that went in on the first line. As described earlier use a utility knife and straight edge to cut at the slots in the shingle effectively creating three equal sized pieces of ridge cap from one 3 tab shingle.
Roll out and staple down roofing felt in overlapping rows. Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across the roof. Starting at the bottom of the roof map out a guideline with chalk. Attach the starter strip nail down the shingles in an overlapping pattern that covers seams and nails.
Drive a nail at one end first then drive the others. Instead of cutting off all three tabs you can also reverse the shingles for a starter course so that the entire.