How To Put On Roofing Shingles
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
How to put on roofing shingles. Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles. These roof caps will lay atop each other and the angled area will be completely covered by the finished portion of the shingle. Watch and see how easy it is. When installing shingles start by laying a narrow row of shingles at the bottom of the roof along the edge.
This will help determine how the shingles will lay on the. Asphalt shingles are easy to install last anywhere from 10 to 50 years depending on the type and are less expensive than other roofing materials such as slate tile and metal. It generally takes three bundles of shingles to cover 100 square feet. Using the chalk line snap a line between the two marks to get a straight edge.
Shingling a shed and want some tips. Complete the application of underlayment and valley flashing before the roofing shingles are applied. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps. Remove old shingles and.
See below for a shopping list tools and steps subscr. Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across. Continue laying your shingles horizontally up the roof. To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the top on each end of the house.
Next lay the first full row of shingles so they re directly covering the starter row. Pull the drip edge down about a half inch from that line to create a gap between the drip edge and the fascia board. Cut a number of shingles into thirds separating each shingle tab into an individual roof cap shingle. The recommended flashing material is a 28 gauge galvanized metal or an equivalent corrosion resistant non staining material check with local codes.
Center a 914 mm 36 width strip of an ice and water protector membrane in the valley. Get the right number of shingles for the job. Many pros shingle in a vertical line up the roof because it s much faster. Preparing the roof 1.
Measure the length of a shingle as it lies across the roof.