How To Put Cedar Siding On A House
New cedar shingle siding is going over the old as part of a lead abatement program but the contractor is using techniques that make the homeowner nervous.
How to put cedar siding on a house. After the cedar has acclimatized and before it is installed it should be coated on all surfaces including the ends. Plywood sheathing provides a sound flat base for lap siding. Be sure to have adequate ventilation and extinguish all pilot lights before applying and drying the waterproofer. Join the clapboards with scarf joints as in step 3.
Carefully slide the notched piece of siding into place. Learn how to properly install cedar shingle siding on an old house. Define the bottom. How to install cedar shingle siding step 1.
As in the above illustration at inside corners siding is frequently butted against a 2 x 2 trim strip. Again follow the manufacturer s recommendations. If more than one clapboard is needed to span a wall snap a chalk line between the marks on the corner boards on top of the course being overlapped. Always apply primer or stain end cuts.
Fasten a cedar starter strip. Is the contractor wrong to use this method. It can also be butted against adjoining walls with a trim strip used to cover the joint. Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board.
Your options include thicknesses from 2 to 4 and widths from 6 to 10. The prime coat depends on the final coat. Horizontal hand hewn cedar log siding can be installed on an existing home or a new build. How to install cedar bevel siding 1.
Nail the clapboard to the studs. Begin the installation by wrapping the house with a waterproof membrane either 15 to 30 pound felt or. Place shingles on the guide board and fasten them offsetting joints by at least 1 1 2 inches. With corner boards there is the choice of applying them next to the siding or over top of the siding as shown here.
Your options include thicknesses from 2 to 4 and widths from 6 to 10. Once you have built up the corners by about 10 courses snap a chalk line to mark the bottom of the next course. Staple a layer of house wrap to the sheathing working from the bottom up and overlapping joints by several inches so that any water that reaches it will shed down the wall.