How To Nail Lp Smart Siding
Smartside siding instructions wall preparation.
How to nail lp smart siding. Nail from the center of the siding toward the ends or from one end to the other end. See diagrams 6e and 6f fastener length. Because siding is considered a cladding material it is necessary to have a weather or vapor. The nails should be long enough to penetrate the structural framing by at least one and one half inches.
In this instructional video we demonstrate how to install lp smartside lap siding using h molding which gives a more professional look with equal functiona. Shim siding at studs as needed to avoid drawing siding against uneven walls. The manufacturer requires proper fastening of the product to the home. 3 16 gap at butt joints between horizontal sections and where the siding meets doors windows and corner trim.
Do not attempt to edge nail without pre drilling. Do not overdrive nails. Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them. Apply nails to meet the specifications in the general application equipment section in this document.
Nail head should seat firmly to face of siding but not be overdriven to distort the. To fasten the. As in standard construction practices install smartside siding by nailing to studs spaced 16. How to install lp siding starting with the trim.
You want to use a minimum of 113 inch shank diameter hot dipped galvanized box style nail with a minimum of 270 inch head diameter. Never nail from the ends of the siding toward the middle. The nail heads should be driven to the top of the siding only and not below where visible product fibers can be seen. Sensitive to moisture smartside siding requires proper wall preparation to protect it from moisture.
38 series cedar shake. Once you have installed the majority of the trim you re ready to begin installing the siding. Lp smartside strand substrate cedar shake.