How To Nail Down Roof Felt
In terms of spacing leave about 6 inches between nails along both of the short sides and the side lying next to the edge of the roof.
How to nail down roof felt. Apply and attach drip edge. Defer putting drip edge on angled gable ends until after the felt is laid so the metal. Cut drip edge flashing at an angle at the corner press it lightly against the eave end. Use a trowel to spread roofing cement over half or more of the strips.
Cleaning and preparing your roof 1. Step 4 over the peak. Grab loose pieces of felt and pull them off the roof. Use a ladder to reach the bottom level of the roof.
Using galvanised clout nails nail down the first layer of felt. Ensure the felt remains even and straight as you work. Remove old felt from the roof with your hands and a putty knife. Valley ridges and hips should have a 6 inch overlap of paper.
An assumption is made all materials are ordered based on the necessary measured requirements. Apply drip edge to the eave. Clean the decking as well as. Clean the roof decking of any debris protruding nails or other objects.
The paper should then be nailed in or stapled every three to four inches across. Dry the roof surface. Paint a thin layer of adhesive over the first felt layer. How to do it.
Step 3 overhang paper. All nails and staples should be placed on the lower half of the paper. Begin your first row of tar paper with the bottom of the tar paper slightly hanging over the edge of the roof. Gently scrub the roof using a bristle.
Roll out the tar paper along the. Step 5 secure ends. Fasten drip edge on eaves with galvanized nails and a hammer about 12 inches apart before laying roof felt. Step 2 roll it out.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches. Step 1 prep the area. Let it stand for about 30 minutes and then using galvanized nails and your hammer nail down the first layer. Overlap and cut drip edges.
Roll the felt so that it overhangs the edge by 2 inches.