How To Make A Sheet Metal Blowout For A Furnace
The kind of pipe you use depends on what you want to use for your fuel source.
How to make a sheet metal blowout for a furnace. Feed a steel pipe or burner through the side hole of the furnace. This is a long video with an almost continual verbal description of all the steps of the layout. How to prepare the plenum adapter for smaller or bigger size air handler duration. Hvac training is required.
Support me on patreon. Furnace ducts are usually made of sheet metal especially in older houses and carry the heat from the furnace to different rooms in the house. In this video i build a simple metal drop box to use as a supply grill fitting. Save up to 30 when you sign up with this link to housecall pro.
Place a small dust bin in the center and then introduce the pvc pipe from the hole at an angle it should be angled because in case the crucible breaks down the metal would stay in the furnace rather than dangerously flowing out on to the floor begin filling by first filling the base then scotch taping the pipe to the dustbin and scotch taping the hole with the pipe through when you have filled the concrete in this sides then let the furnace dry up for at least 48 hours. If you have a heat pump the ductwork will be used for both heating and cooling. After an hour it should be set and you should be able to pull it out easily. Northend home heating specializes in custom fabrication.
Mix together in the 5 gallon bucket used earlier and after you feel there is minimal clumps carefully put in 2 4 u bolts and carefully stand them up right in the bucket mix. Some viewers just want to see the steps performed. Furnace ducts are generally made of out sheet metal that s formed into tubes.