How To Lay A Pro Panel Roofing
This does not replace local or state building codes.
How to lay a pro panel roofing. Use a scaffold for easy access to the roof. Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm. Install the roofing screws vertically along each rib in the panel. How to install premium pro snap roofing step 1.
To do so flip the panel over and make marks on the reverse side. Fasten using panel wood screws. It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame. Put your tape up against the end wall and measure down to the edge of your eave trim.
Pro panel ii install guide. Place the leading edge of the first panel along this line. Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof. At this point chalk a line from ridge to eave.
Take measurements from the roof peak to the eave for custom cut premium pro snap panels. This guide is supplied by fabral inc. Contact building regulators to determine the requirements for. 9 roofing panel install with lower edge 1 above the transition bend.
Measure the roof with a. 5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater. Do not stand on the roof panel until the panels have been attached. 8 inside closure install along the length of the transition trim about 2 above the bend.
This guide must by read in its entirety before beginning installation. The roof panels will not withstand the weight of a person standing at the edge of the panel. Be sure the larger edge is laid so that the small edge of the next panel will overlap it. Place the first screw.
Measure one panel width in from the roof edge. 10 panel wood screw space according to the recommended fastening pattern and local codes. For this example it s exactly 24 inches and i m going to add an inch and a half to that measurement and cut my panel to length. To watch the entire series from the beginning click here.
For use by its customers and is intended to be a guide only. Always begin working at the point with the longest peak to eave distance. Add the metal panels.