How To Lay 3 Tab Roofing Shingles
Whenever you are laying shingles it is always a good idea to go to the middle of the roof along the edge to begin with.
How to lay 3 tab roofing shingles. Drive a nail at one end first then drive the others. Video 12 install lp smart side panels part 2. Bring a trash can up on the roof so you have a place to throw old shingles and flashing. In all use four nails per 3 tab shingle.
Video 8 install lp smart side panels part 1. Place nails in the three tab shingles about 3 4 inch 1 8 centimeters above the cutouts near where the tab meets the upper part of the shingle. Around an inch should do. This video focuses on laying 3 tab shingles on.
Each shingle will require around 4 nails underneath the tar line and about half an inch under where the next shingle will overlap. Add the areas of each section together. Step 3 start line. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Lastly multiply this number by 3 and you will know how many packs you need to buy. However make sure that you do not nail into the tar strip. Video 14 how to install an entrance door. Video 13 installing 3 tab roofing shingles.
Video 9 build install soffit ladders. If you are using a power nailer drive nails by squeezing the trigger and bouncing the nailer s tip onto the shingle. Lay more shingles on the sides of the roof so that they overlap the start shingles. Video 10 install roof sheathing.
From there you will need to lay down the start line for your shingles. Also place a nail 2 inches from each end of the shingle in line with the other two. The first row of shingles should overhang the drip edge of the roof. Video 11 install fascia boards soffit material.
Next remove old shingles and flashing. A chalk line will need to be popped going down the middle of the roof from the bottom to the top. Divide that number by 100 to get the correct number of squares. Attach and align shingles to attach a 3 tab shingle align it with the layout line and drive nails 1 2 inch above the cutout slots including the half slots at each side.