How To Install Vinyl Siding On Dormers
8 install the top row of siding.
How to install vinyl siding on dormers. Fasten metal starter strip at the bottom of the three walls. Make the vertical cuts on the siding panel with a saw and make the horizontal cut with a utility knife then snap out the piece. Make sure this is a very snug and comfortable fit. Nail in the center of the starter strip nailing slots.
Level the piece of siding. As vinyl siding is considered to be one of the most authentic sidings from the other because it is inexpensive and easy to install. Place another piece of siding against the angle of the roof where the roof meets the dormer so that the two pieces of siding meet to overlap. Use a vinyl corner piece along the front section of the dormer.
How to install vinyl siding on dormers step 1. Step 1 vinyl accessories the first thing you will need to do is attach the vinyl j mold to the dormer along the joint between the dormer and the roof. Ryley demonstrates how to avoid seams how to transfer an angle from the roof to the trim and how to create the. Install the cut pieces of siding above and below the windows as normal.
Use a professional siding trick to determine the angle of cut for your siding pieces. Pull the paper out and over the flashing after and use tuck tape to tape it to the flashing. Cut vinyl panels with tin snips to fit along. Cut this with tin snips so it is about 1 4 inch short.
Install corner posts on the two dormer corners utility trim under the window sill and at the tops of the three walls. Attach matching vinyl j mold to the angled side of the dormer along the roof line. Many people like this vinyl siding because of its features like it can also be installed on the dormers of the house but you need some tactics to avoid the damage on the dormers. Using the chalkline as a guide install the top edge of the starter strip along the chalkline nailing at 10 254mm.
Keep the ends of starter strips at least 1 4 6 4mm apart to allow for expansion fig. Begin with a starter strip on the front at the elevation you want usually about 1 2 or so above the crease in the flashing install all your corners and j channel. Bob helps carpenter bob ryley apply exterior trim to the gable end dormer window. Once that is done you can start the siding.