How To Install Vinyl Siding On A Peak
Next measure and cut the siding to fit the measurements of your soffit and push each panel into the j channel.
How to install vinyl siding on a peak. A great tutorial on how to cut install vinyl siding using just the side track saw table ordinary stanley knife shows cuts around top bottom of a windo. Clearance on each window side. From the top of this row and stretch a string line across the deck. Some manufacturers of vinyl siding do not recommend the use of drop in backers with certain vinyl siding configurations.
Begin by installing the first row of siding on both sides of the deck. It protects the sheathing from rain snow and pests. Next lock a scrap piece of siding into the panel below butting against the window. Pop a level chalk line for the starter strip an inch or two above the bottom of the siding.
Nail the starter strip to the siding aligning the top of the strip with the chalk line. You need to leave at least 1 4. Below the top of the foundation but the lower the vinyl siding is installed the better. To install vinyl siding to the soffit and fascia area on your home nail lengths of j channel along the inner edge of the fascia leaving the nail heads out about 1 32 to 1 16 of an inch.
Vinyl siding must never be applied directly to studs without sheathing. Clearance below the sill. Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth. When cutting vinyl siding it s usually to go into a corner.
Attach j channel trim strips around windows and doors and along the eaves. If you don t cut your siding short when it expands in the summer it s going to buckle. As an alternative installation of specific types of drop in contoured foam underlayments for various styles of vinyl siding are available. Use the wider starter strip.
To provide a common reference point measure up 8 in. The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.