How To Install Vinyl Siding Around Doors And Windows
Continue cutting j molding for the remaining sides of the window and continue the process of nailing them.
How to install vinyl siding around doors and windows. From the top of this row and stretch a string line across the deck. Mark the siding at 1 4 inch past the edge of each. Along the tops install j channel trim with horizontal siding and base trim with vertical siding. Install the tops first then the sides and then the bottoms of the window surrounds.
To ensure our content is always up to date with current information best practices and professional advice articles are routinely reviewed by industry experts with years of hands on experience. Install door window trim. Apply a bead of caulk to the felt and set the window in the caulk. Install the snipped j molding along the bottom of the window.
Place the siding where you want it and mark it a quarter inch from the edge. Roofing nails should be hammered in every eight inches. Slide the zip tool under the butt edge of the siding hook the locking edge and pull down. Install the trim just under the drip cap.
Place the piece of siding to be installed under the window along the bottom edge and hold it where it will be located horizontally along the wall. Draw a line on the wall along the top of each siding course before you pull the nails. Always refer to the installation guide on the particular vinyl siding that you re installing but most vinyl siding panels should overlap each other by at least an inch. Then slide the tool horizontally along the lock to release it.
Lift the unlocked siding to expose the nailing hem of the siding piece below. Install the cut pieces of siding above and below the windows as normal. Make the vertical cuts on the siding panel with a saw and make the horizontal cut with a utility knife then snap out the piece. Before installing door and window trim first caulk around the openings to create a moisture and air proof seal.
To provide a common reference point measure up 8 in. Next comes another layer of building wrap installed like the first layer. On nov 21 2010. Begin by installing the first row of siding on both sides of the deck.
On hot days because the siding will contract when the temperature drops.