How To Install Underlayment On A Hip Roof
Peel back 1 to 2 feet of release liner align membrane.
How to install underlayment on a hip roof. Adding various types of roof vents either hip vents or mushroom vents for example could help you get close to code requirements for venting. Pick a corner to start placing the plywood sheathing. This also applies to metal hip or valley flashings that may be specified. Install underlayment a minimum of 6 inches up roof protrusions or vertical abutments.
Where the drip edge meets a valley or a hip cut the pieces with overlapping tabs. Use nails to tack the sheet in place on the rafters to hold it in place while you work. Where drip edge pieces meet overlap them by at least 2 inches. Sheathing goes onto a roof prior to the final roofing material e g shingles.
Nail the plywood sheathing to the rafters. Start at the bottom of one side of the roof at the right or left edge. This would create a great roof but it would be expensive and it s probably overkill. Install a layer of roofing insulation as recommended by the roofing manufacturer.
Position the first row of roofing felt flush on the bottom with the edge of the gutter apron. Start the roof felt at one bottom corner of the roof. Press the membrane of the self adhering roofing underlayment in place with heavy hand pressure to ensure the desired adhesion to the roof deck. Start from the top of the roof and remove the old shingles along with the flashing underlayment and vents.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof. Learn more about how to install owens corning proarmor synthetic roof underlayment. Roofing felt comes in rolls that feature pre marked lines 2 to 3. For more information on this approach see how to install rigid foam on top of roof sheathing.
Hammer down any large nails that are exposed by the removal. Install a single vertical length of underlayment roll centrally over hips and down valleys before weaving horizontal underlayment across the valleys and hips. Peel the release liner from the membrane. Press the tabs firmly to make crisp corners with no gaps and attach with roofing nails.