How To Install J Channel On Roof
Install the trim by nail the longer side of the j to the framing lumber with the washer head metal siding nails.
How to install j channel on roof. Turning a corner to turn a corner measure from the channel at the wall corner to the channel at the corner of the fascia board. Step 1 attach the j trim along the line that will form the upper edge of the metal siding. Overlap the j channel 3 4 to allow for expansion. Bob werner and jd smith install vinyl j channel at the roof wall interface a reese 59 second snapshot video ytv200b by john reese and uv concepts.
Divide the length of each wall by 8 inches the width of a piece of siding. If the result is a whole number you re in. How to screw a j channel to hold soffit step 1. If you have to cut the last row of siding you ll.
The metal siding will slide into the j trim so install the channel with the opening of the j facing the direction of the siding. Line up the j channel next to the soffit under the eave of the roof. Use corrosion resistant galvanized stainless steel or aluminum roofing type nails with a head diameter of. Installing j channel for soffit j channel pieces should be installed similarly to the f channel across from each other so the soffit fits between the lengths of the j channel.
You can use roofing nails that are made of galvanized aluminum or stainless steel with high user ratings and good resistance to corrosion. I m in the middle of a residing project about to get to where a wall meets the roof. Cut out a 1 section of the nailing flange and face return as shown. Install inverted j channel along the top of the wall under the eave.
Slide the first piece of j channel over the. Will need to install j s along the transition for the new siding but afraid that nailing the j channel over flashing will cause problems with water getting in from around the nails. Measure the gable of the roof with a tape measure. Here again leave a 1 4 gap between the j channel and the cornerposts.
But if the result is not a whole number you will need to cut the final piece of siding lengthwise in order to fill in. Climb up a ladder and measure directly under the soffit where. If necessary install nailing strips to provide backing for the lineal.