How To Install Gutters Properly
If the fascia board you re installing them on is longer than 35 feet have the gutters slope from the center to each end.
How to install gutters properly. To install gutters have the gutters slope downward toward the downspout so they work properly. When installing gutters set the proper slope by driving a nail 1 2 in. Secure the downspout outlet to the gutter with four pop rivets or screws. Below the shingles on the high side of the gutter run.
Screw a downspout elbow to the outlet tube protruding down from the gutter. Mark both ends of the string with a pencil then remove it. 5 snap a chalk line between the start and end of the gutter run. Hold another elbow against the house and cut a piece of downspout to fit between the two elbows.
Repeat this process for all gutters around your roofline. For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run. Slip h idden fasteners into the gutter run and screw the gutter into the fascia with a drill and screws. Apply gutter sealant to an end cap then press the cap onto one end of the gutter.
Use needlenosed pliers to slightly crimp the elbow to fit into the downspout as shown. More diy home improvement projects. Measure the fascia to determine the length of the gutter. Installing gutters in 18 steps.
Measure and record the distance from the bottom of the fascia board to this nail. Where the gutter wraps around an outside corner first attach splice fittings to the corner piece with rivets connect one splice to the preceding length of gutter apron. Or if the fascia board is less than 35 feet long have the gutter slope from one end of the board to the other. Install the next length of gutter and fasten it in place with hidden brackets and then rivet the splice connections.
Take the downspout end of the string lower it 3 4 of an inch and reattach it. Snap a chalk line from these two marks to determine the line your gutters will follow. Hidden fasteners are placed every 24 inches along the gutter run. Install gutters 1 1 1 2 in 2 5 3 8 cm past the end point so they catch water from overhanging shingles.
Continue this process with gutter sections. Using the chalk line to keep the gutters flush with the slope line attach the downspout outlet to the fascia with the power drill.