How To Install Everlog Siding
Slide the bottom of the siding into the footer being sure to allow for expansion.
How to install everlog siding. Installation of our everlog siding is simple and can be completed by any contractor or do it yourselfer. In conjunction with our installation guide this video will show you just how easy installation can be. Mark length needed on siding a template tool can be made to automate markings for square or pitched cuts. Affix the siding to the wall by centering a nail in each section of the nail strip.
You should be able to wiggle the siding slightly. The corner posts should run from 3 4 inch 1 9 cm below the bottom of the starter strip to just beneath the eaves after the soffit pieces have been installed. Install 1 2 inch 12 7 mm foam sheathing strips on both sides of each corner then install your corner siding pieces to these strips. A forklift is required to unload crates from the trailer.
Mark the siding with a clearly visible line. Slide the ends under the corner posts in the same manner. Because everlog siding comes in stock twelve foot lengths it will need to be cut to fit. Mark the siding with a clearly visible line.
Mark length needed on siding a template tool can be made to automate markings for square or pitched cuts. Measure length of siding needed again allowing for one eights inch gaps on ends. Install your starter sheet. Because everlog siding comes in stock twelve foot lengths it will need to be cut to fit.
Measure length of siding needed again allowing for one eights inch gaps on ends. Mark length needed on siding a template tool can be made to automate markings for square or pitched cuts. Because everlog siding comes in stock twelve foot lengths it will need to be cut to fit. Everlog siding comes pre finished and is packaged in durable crates.