How To Install Epdm Membrane Roofing
The two part drip trim consisting of a back plate that is nailed flush with the top of the roof deck.
How to install epdm membrane roofing. The epdm membrane is then sandwiched between this a bead of mastic and the front trim which is finally nailed with stainless steel plastic topped pins to finish. Glue and roller ready to start application of adhesive. And started the glue application process by pouring a good dollop of glue into the paint tray. Start by laying out the entire sheet of epdm on the roof of your camper.
Remove any loose shingles. To do this i folded back the front section of the roof membrane. Position the epdm membrane. Classicbond epdm is the original epdm roofing system with a proven track record of over 50 years service life.
Leave the material for the next 20 30 minutes to let any folds or creases fall out. Some folks do half a time and some do much less. Before doing anything with your rubber roof take the time to thoroughly clean the roof. This helps get everything lined up and helps relax the material.
Step 2 roll out rubber membrane. Installing an epdm rubber roof. This board called iso board by roofers is different from ordinary rigid foam board in that it has a special glass fiber reinforced felt skin that is compatible with the epdm adhesive. Once it is laid into position you need to decide how much of it you want to glue down at one time.
Applying bonded adhesive to roof and wall edges sealing roof corners using pressure sensitive flashing such as elastoform creating watertight seals for any equipment with roof penetrations affixing the drip edge wall trim and gutter trim using screws. I started to install epdm roofing on the short front section of the roof first. Step 1 clean off the roof. Epdm is installed over a special felt covered insulation board.
Step 3 apply adhesive. Recognised as one of the most reliable durab.