The ferrules are metal bands or caps that have the same width along the entire gutter system.
How to install drainage using gutter material. To prevent erosion make a rock bed around the end of the tube. For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run. Step 1 start from the location of the down spout on the gutter system and mark the desired path of the pvc drainage pipe on the ground using construction marker spray. While this temporarily holds the cap in place drill another 1 8 inch 0 32 cm diameter hole and attach a pop rivet into it.
When installing gutters set the proper slope by driving a nail 1 2 in. Now remove the temporary screw and attach a rivet into the same location. Below the shingles on the high side of the gutter run. Assemble and place the catch basin.
The easiest way to dig the. The gutter system is held to the roof s eaves by spikes and ferrules. Where the tube passes by the downspout from the gutter we installed a y fitting and drained the roof water from the gutter system directly into the main drainage line. Step 2 begin at the very end of where the drainage will end and set the depth on the trencher to 16 inches.
Dig trenches for drainage pipe. Now that the trench is dug you can assemble the catch basin. About gutter spikes and ferrules. It is best you install drip edge extensions into the gutter system to prevent any damage on the boards.
Connect the end cap s to the gutter using silicone sealant and screws. Hold the cap in place and insert a single sheet metal screw into its hole. Measure and record the distance from the bottom of the fascia board to this nail. Before digging call 811 to have utility lines marked.
Installation of gutter drain including downspout and hdpe triple wall pipe.