How To Install Architectural Roofing
Cover the rest of the roof with no.
How to install architectural roofing. At no place on your shingle roof should the shingles line up exactly with the shingles in the previous row. Architectural roof shingles and tabbed shingles are both roof shingles but when it comes to nails they are different. If you live in an area with inclement weather you should consider using a special ice and water protector. If you are thinking of installing shingles on your roof then you should think of installing architectural shingles as these can provide a great look to your roof and exterior.
Start installing at the outer and lower edge of your roof. Start by laying asphalt felt or other underlayment over the roof. Call your building inspector for local details. In severe climate regions most building codes require applying it 3 to 6 ft.
Welcome back to how to build a shed playhouse part 6. Installing your architectural shingles begin your first row at the lower left corner of your roof. Up from the eave minimum of 2 ft. How to install architectural shingles or better stated how not to install is an explanation of how to and how not to install architectural shingles.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only. Here s what to do. Buy it at roofing supply companies or home centers. Install new flashing metal.
We are finally applying the. Apply a cover of starter architectural shingles. Before you install your first shingle use your utility knife to cut 6 inches off of the side then lay it on your roof allowing the architectural shingles to hang between 1 2 to 2 inches over the edge. Around an inch should do.
Having this type of shingles on your roof can also add to your property value more than the traditional shingles. The first row of shingles should overhang the drip edge of the roof. Past the exterior wall. Overlap each row at least 3 to 4 inches.
Lay one row of shingles starting from the lower left corner of the roof. Using your staple gun secure the felt to the roof. Overlap layouts are also included with the roof. Lay the next row of shingles directly on top of the.
Each shingle will require around 4 nails underneath the tar line and about half an inch under where the next shingle will overlap. Do both sides first and then install ridge cap shingles over the top.