How To Install A New Tile Roof
A 28 gauge corrosion resistant flashing is recommended.
How to install a new tile roof. After installing the underlay it s time to install the metal flashing around chimneys conduits vents and where the roof meets a vertical wall. Installing the underlayment 2 2 8 per sq. Quantity includes typical waste overage material for repair and local delivery. Follow these simple steps to install your clay tiles.
Terracotta finished tile roofing. Tile roofing installation labor basic. Tile roofs must be installed to the australian standard as 2050 installation of roof tiles. Install tile to the entire roof area adhered using hybrid tile bond high wind resistance polyurethane foam adhesive and stainless steel screws.
14 x10 tile with ceramic finish. Secure the underlayment with nails that are at least 2 inches from the edge of the roof. Repair is costlier on a per square foot basis because it is more time consuming to integrate new shingles into a roof here and there than to install them over the entire roof. Tile roof cost non discounted retail pricing for.
If more than about 35 of your roof is going to need repair due to wind or hail especially if it s already 12 years old the cost effective decision might be to replace it all. Simply overlaying the tiles on the existing roof is a cheaper option but be prepared to pay the above costs for any replacement of old roofing. The installation process often begins with removing the old roofing material or installing the new roof on top of the old one. Install cap tiles at all hip ridge areas using hybrid ridge anchor tile tite cement and tile bond foam adhesive to achieve the highest wind resistance.
If your roof has a steep slope install the battens next which are thin strips of material that run horizontally along the roof. The process of tiling a roof begins with the installation of the guttering and fascia boards and the bulk delivery of the tiles to the site. 50 yr limited warranty. Install the underlayment for the new roof tile next working with 10 foot sections at a time.