In cases where they are installed perpendicular to joists figure 3 some joists will need to be cut and tied in to other joists with 2 x 6 or 2 x 8 headers.
How to install a header in the attic. Mounting the header in the attic for the load bearing wall. One non load bearing and one load bearing. Next we spread a bunch of construction adhesive on the installed lvl then lifted the second lvl into place. Cut a piece of 2 x 4 or 2 x 6 lumber to fit snugly between the joists directly above the newly cut edge of the opening.
Begin to secure the ladder by pre drilling four 1 8 inch pilot holes at the top of the frame. These headers will form the box frame into which the stair will be secured. Nudge the bottom of the jack studs into place pro tip use some scrap 2x material to prevent damage to your stud then nail the jack studs to the king studs and nail the header to the stud and toenail it into the top plate. Fasten the header to the joist at each end with screws.
If you re installing more than three lvls you ll have to nail and bolt them together. Most attic stairs will be installed parallel to the ceiling joists figure 2. Now you can open the ladder to continue the installation. Spread heavy duty construction adhesive between the beams for extra strength.
Use your drill and two wood screws to hold the frame of the ladder to the header of your support structure.