How To Install A Cold Flat Roof Drip Rail
Slide the flat bar under starter course and pry out the nails.
How to install a cold flat roof drip rail. Use a flat pry bar to remove drip edge nails along the eave and rakes. You may need to use a putty knife to break the seam between the first course and the starter strip. Please like and subscribe for more instructional videos. Of course there is an installation spec manual from ib roofs which we always keep handy and actually had to use once or twice.
Find out how to waterproof a flat roof with the innovative permaroof gutter edge trim. Tools supplies tin sn. Raise the shingles and push the top rim of your drip edge beneath them. Secure the drip edge with roofing cement.
On some roofs you may need to remove a couple of shingle nails to make some room to work. Nail it in place with roofing nails that penetrate at least 3 4 inch into. If it doesn t pull the drip edge out slightly from under the shingles. This lets any water that gets on the roof run down the underlayment and over the drip edge.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated. With without rain gutters. In today s video we go over the basic techniques to installing drip edge and rake edge on your roof. How to install a drip edge.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge. Watch the contractor seal the roofing membrane within minutes. Begin installation it is best to install a drip edge on a day with warm weather because it makes it easier for the shingles to be stripped back. Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Make sure the outer edge extends over the gutter. Rubber roof repair kit available on amamzon. Otherwise the system may not work the way it should. Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end. Installing a flat roof pvc single ply roofing membrane in this case can be a pretty straight forward process or a very confusing endeavor because each component must be installed in a particular order.