How To Fix Zinc Strips On Roof
It works with any wood or composition roof.
How to fix zinc strips on roof. Step 1 safety. Ridge where the zinc strip is installed re growth can occur. Preventing roof moss with zinc strips. Step 3 installing the zinc strips.
Z stop is a zinc roof moss algae and fungus inhibitor that is applied in strips to old or new roofs. Apply z stop below anything that blocks rain water flow such as chimneys gables and skylights. Do this the full length of the roof. Step 4 maintaining the.
Zinc strip will help control the growth of moss and mildew it will not remove existing growth. In these cases installing a second zinc strip approximately halfway down the roof slope is recommended. That is you nail down a course of shingles then lay down the new course above the last course working up the roof. The cord and reel can melt itself and the reel and cause shorts.
Apply z stop zinc strip 50 foot roll by butting it up against the ridge cap against both sides of all roof peaks see graphic. How to install a zinc strip to prevent moss on your roof. Only areas below the zinc strip will receive protection. Z stop a zinc strip 50 foot roll that s easily installed on your roof acts as a barrier to roof moss algae and fungus growth protecting the roof its appearance and value.
The premade ones are much quicker and probably neater looking. Zinc is sold as a moss prevention product. Install z stop zinc strips 50 foot roll to keep it from growing back. Zinc strip can be used on asphalt shingle wood shake and tile roofs.
Put on your protective eyewear work boots and work gloves before you begin. You can cut strips of zinc flashing copper and lead work too and slide them under a course of roof shingles to kill lichen and moss growing there or you could just buy these premade strips from shingle shield. A rolled up cord creates a large electrical coil and if the extension cord is then used above at or close to maximum amperage rating the electrons flowing through a coil will likely it heat up and cause voltage drop. Be careful moving up and down the ladder.
Step 2 preparing the roof. Use a putty knife to break the shingle seal slip the strips under the shingles about 2 of the strip should show nail the strip with a galvanized nail under the shingle every two feet so they don t slip out caulk the nail heads with clear silicone caulk press the shingle down. At the ridge before a ridge cap goes on you also nail down the zinc strips placed so they will protrude beyond the ridge cap.