How To Fit Dry Verge To Existing Roof
A timber batten can then be installed running from the eave to the ridge to provide a base for the units to fix into.
How to fit dry verge to existing roof. Available in multiple colours to match tiles. Have an integral design feature e g. Tile batten overhang have an integral design feature e g. If working on a flex dry verge system ply the verge unit open and push it onto the tail of the first verge unit ensuring the end of the verge lines up with the end of the tail and nail the top into the batten end clip.
Screw the starter verge into. Nibs that keeps the verge unit away from the wall. A dry verge system that fits both the right and left hand side of the roof is also available for all other redland interlocking concrete tiles. The starter insert is a solid block that seals the first.
Extend the tiling battens 45mm beyond the bargeboard brickwork or gable ladder. Today we re showing you how to inst. Drainage channels that diverts water away from the wall. Place the starter verge over the last shingle or tile on the roof.
Fitting dry verge to old roof if you are fitting your dry verge to an existing building you need to remove all of the old underclock and motor bedding before fixing. Be positioned off the wall e g. Position the second verge unit in the slots of the first one if the product features slots. Battening setting out install the underlay according to the manufacturer s specifications.
Slide the starter insert into the channel of a dry verge. Position starter verge where the roof tiling or.