How To Do Offset Cedar Shingle Siding
Begin installation in corner.
How to do offset cedar shingle siding. Also offset joints in successive shake or shingle courses by at least 1 1 2 inches as shown in figure 1 15. What the mccues decided was to go with red cedar shingles that have been treated with bleaching oil. Regardless of color cedar shingles do require initial treatment and some maintenance. With white cedar shingles also make sure that two joints do not align if separated by only one course.
How to install cedar shingle siding. Proper shingle coating and protecting stains are critical to the longevity and desired appearance of a house s exterior. Working in tandem with a helper or working alone stain one length of siding from end to end before moving down to the next board. Treat knots and other defects like an edge and offset adjacent courses at least 1 1 2 inches.
Install the windows and door jambs so you can trim the doors windows and corners of the house with wood trim. First remove any mill glaze a hard shiny surface on one side of the siding by sanding. How to do it. Align the thick lower edge of a cedar shake at the lower edge.
Be sure to keep the hose pointed downward to avoid forcing water up behind the shingles. Cover about a 4 by 8 foot section with the liquid and let it sit on the siding for about 15 minutes. Begin the installation by wrapping the house with a waterproof membrane either 15 to 30 pound felt or semi permeable house wrap. If possible stain all sides of the siding before installation.
The installation of cedar shakes or wood shingles is more time consuming and difficult than that of regular wood siding because they are smaller irregular in shape and have to be applied one by one. Apply it with a pump sprayerlet it sit for about 15 minutes before rinsing it off with with a garden hose. Start at the bottom of the wall at one end. Pour the mixture into a cleaned out lawn and garden sprayer.
Mix the oxygen bleach in a ratio of 2 cups of powdered granules to 1 gallon of water or based on the product and manufacturer s instructions on the label. The cedar bureau recommends using a solution of 1 part bleach to 3 parts water. Apply overlapping horizontal rows of building paper onto the shear wall using a staple gun with 3 8 inch staples.