How To Cut Pro Rib Steel Siding
While installing vertical metal siding is similar to installing horizontal siding there are a few differences you ll want to keep in mind.
How to cut pro rib steel siding. Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails. This should leave approximately 3 of grade board exposed at the bottom fig 2. Cutting the siding around window and door openings will be necessary though and for that i used a couple different tools. This panel delivers value with high performance.
This controls how the metal flexes and gets a cleaner cut. Metal roofing is also available in the form of shingles. It s environmentally friendly and manufactured to the highest industry standards. You may need to cut panels to fit angles using a circular saw with a metal saw blade.
Cut the first rib off leaving of rib on the first sheet of side steel fig. All of the pro rib steel panels can be custom cut to the inch to save you time and money. To compensate for how metal may curve or bend cut a strip out where you use red snips for one side and green snips on the other cutting 2 inches at a time on alternating sides so two inches up the right side two inches up the left. Make sure the first sheet of sidewall steel is level and the top of the sheet is even with the top edge of the edge purlin.
Similar to j channel used with vinyl siding j trim is nailed to the building s framing at the top edge and along any interior corner seams to hide the raw edges of the siding. Fortunately with the right tools and preparation putting vertical metal siding up on a building can be a smooth and simple process. J trim installs on steel sided buildings such as pole barns and commercial buildings as the finish trim to steel siding. Continue adding panels until the roof is covered.
Position the first panel so it is square in the corner.