How To Connect Two Pieces Of Siding
Slide the zip tool under the butt edge of the siding hook the locking edge and pull down.
How to connect two pieces of siding. Install the first length of z flashing. The corners of vinyl siding are one area where moisture can get in under the siding. Lay out the panels required for the first course along the house. Then slide the tool horizontally along the lock to release it.
Miter or cut tabs at the ends. Lift the unlocked siding to expose the nailing hem of the siding piece below. Use the factory cut edges on the outside for the smoothest appearance. This channel conceals the cut edges of the soffit lengths as they meet the fascia.
Nail the side pieces every 12 inches placing the top nail at the top of the nailing slot and all other nails in the center of the nailing slot. Then slide the tool horizontally along the lock to release it. Lift the unlocked siding to expose the nailing hem of the siding piece below. Nail the trim every 12 inches on center.
Diy how to fix loose vinyl siding with a malco sideswiper siding tool. Begin at either end of the wall and set the level middle section of the z flashing onto the top edge of the siding panel with the wider flange upward and against the wall framing. Fix mistakes with a zip tool to remove a piece of siding that s already nailed up slide the zip tool available at any home center under the butt edge of the siding hook the locking edge and pull down. When you have to put two pieces of the corner post together to get the length you need be sure the lower piece is underneath and the upper piece is overlapping in order to shed water.
Starting with the soffit nail lengths of j channel against the inner edge of the fascia board. You can use tin snips or a hacksaw to cut the piece s. Connect the different pieces of the gutters and overlap the middle seams by 4 inches. Use sealant where the two pieces fit together.
To prevent this put flashing about one foot on each side of the corner. Make sure you use a tight seal so water doesn t leak through. Cut the panels to length with tin snips. The corner posts should run from 3 4 inch 1 9 cm below the bottom of the starter strip to just beneath the eaves after the soffit pieces have been installed.
Install 1 2 inch 12 7 mm foam sheathing strips on both sides of each corner then install your corner siding pieces to these strips. Draw a line on the wall along the top of each siding course before you pull the nails.