How To Cedar Shingle A Hip Roof
Call us at 214 227 2763 and receive a free consultation from our roofing specialists.
How to cedar shingle a hip roof. Line up the first shingle with the bottom of the entire shingle lined up with the bottom edge of the roof. Trim the very last shingle on each ridge as needed. Then finish by placing the last caps at the very top of the roof. Overlap every shingle by at least an inch and a half from where the edge of the roof is.
How to install a cedar shingle roof on a garden shed. Reach out to the stormpros team to know more about hip roofs and other ideal roofing styles. Make sure all shingles on each side are covered. Use two 31mm x 1 8mm silicon bronze nails per shingle.
Overlap them as before and continue until you reach the top. Start from the bottom edge of the ridge and secure each shingle with 1 1 2 inch nails. We are a brunswick county nc. If you want to keep your roof from getting potential water damage then you need to start.
The first thing you need to do is procure the right number of shingles needed for. Each shingle will have two nails that go in it an inch from either side and 4 inches from the top of the shingle. Secure it to the. Shingling a hip roof preparing your hip roof for reroofing.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches. Lay down a layer of shingles with a second layer over the top until the shingles meet at a single straight peak. Cover all of the nail heads with roofing cement. For speed and to simplify installation use preformed hips and ridges.
How to shingle a hip roof. Page 23 cedar care maintenance overview a word about topical treatments for installed roofs topical treatment products power washing the beauty of cedar download pdf page 24 coverage and exposure tables shingle coverage table 1 shingle exposure table 2 shake coverage table 3 shake exposure table 4 download pdf. Make sure to put the thick end at the top on only the bottom row. Install the flashing on the ridges and tin strips along the edges of the hip roof to provide additional protection against water damage.
It is best to use timber roofing battens and counter battens with a membrane to allow adequate air flow if necessary. Use a hammer stapler to fasten it down applying a staple every 12 to 14 inches. Cover the length of the cedar shingle roof peak that the new layers of shingles have made.